After successful completion of the Atlanta project, Air Tech was asked to provide a similar equipment setup to a site in Houston to replace existing handling equipment.
This is a manual handling system complete with weigh scales and container storage.
Project Totals | Qty |
Castor Deck Area (m²) | 759 |
Barrier Length (m) | 174 |
Walkway Area (m²) | 29 |
Finger Stops | 470 |
Weigh Scales | 2 |
Storage Bed | 16 |