Supplying equipment into Iraq has been an interesting project, working with an existing customer in a new country has presented challenges, all of which were met by Air Tech. The system is comprised of build stations, castor deck, barrier, pallets and a fantastic new product, Air Tech's new pallet mover.
Project Totals | Qty |
Build Station | 3 |
Pallet Mover | 3 |
Castor Deck (ft²) | 5715.6 |
Barrier Length (ft) | 620 |
Finger Stops | 276 |
Weigh Scales | 5 |
Slave Pallets | 12 |